Anti-scratch Industrial Paint for Warehouse Floor
See more pictures
Description:

Advantage:
1. Fast drying, no need to wait
2. Wear-resistant, non-slip, compressive and waterproof
3. Resistant to dirt and stains, easy to scrub
4. High temperature resistance, universal indoor and outdoor

- +
0
- +
0
- +
0

Product Detail
Feedback Now

Mainly used in electronics, electrical appliances, hardware, machinery factory, school, hospital, chemical, pharmaceutical, laboratory, food factory, textile factory, printing factory, chemical plant, computer room, supermarket, parking lot, all kinds of electrical control room, command center And so on the ground has a very high demand for the industry.Mixing Ratio
Primer: 3:1, usage 0.1kgs/sqm
Mid: 5:1, usage 0.1kgs/sqm
Top Coat: 5:1, usage 0.6~0.8kgs/sqm
Technical Data ↴

Color and appearance of paint film Colors and smooth film
Dry film thickness, mm 1.5~2mm
Drying time (25 ℃), H surface dry≤8h, hard dry≤24h, Fully cured 7days
Adhesion (zoned method), class ≤1
Impact strength, kg, CM ≥70
Compressive strength, M Pa ≥85
Tensile strength, MPa ≥9
Bending hardness, MPa ≥7
Wear resistance (Mg, 750g/500r) ≤20
Water resistance 48 hrs, no blister, no fall off, no change color
Alkali resistance 48hrs, no blister, no fall off, no change color
Acid resistance 48hrs, no blister, no fall off, no change color
Leveling property, min ≥5
Hardness (swing rod method) ≥0.6

Double coating interval time: ↴

Temperature 5℃ 25℃ 40℃
Shortest time 32h 18h 6h
Longest time 14d 7d 5d
Surface treatment:
.
Completely remove the oil pollution on the surface of cement, clean the sand and dust, moisture and so on, to ensure that the surface is smooth, clean, solid, dry, non foaming, not sand, no cracking, no oil. Water content should not be greater than 6%, the pH value is not greater than 10. The strength grade of cement concrete is not less than C20.

Construction condition:
.
The temperature of the base floor is not less than 5℃, and at least 3℃ than the air dew point temperature, the relative humidity must less than 85% (should be measured near the base material), fog, rain, snow, wind and rain is strictly prohibited construction.
.
Construction method:
.
Brush / roll coating: must achieve the specified dry film thickness.
.
Construction steps
.
1. Sweep the ground clean to ensure that the ground is clean and flat without ash and sand
2. Brush the floor paint thinly and wait for it to dry
3. Thinly brush the floor paint twice, and it will form after drying

Send your message to us:
×
clear-top-coat-for-epoxy-garage-floor
deluxe-epoxy-flooring
durable-epoxy-floors
epoxy-concrete-coating-exterior
epoxy-floor-paint-amazon
Chat with Vincent Porter
already 1 902 messages

  • Porter 10:51.AM  Oct.21,2021
    Dear sir/madam, Welcome to our website! What should I do for you?